PM02: Eligible Measure Checklist

Seven categories of eligible improvement, from envelope through renewable generation, plus the eligible soft costs — audit, engineering, commissioning, permitting, legal, program fees and capitalised interest — which is the point to make to an owner who resists paying to find out whether a project makes sense. Every measure must also pass the permanence test in JA-03: a measure that appears on the list but is not permanently affixed is not eligible cost. Water conservation and resiliency each carry a screening note directing confirmation with MCED before a water-only or resiliency-only project is represented to an owner. Ends with a six-item not-eligible list and the screening rule: use it to screen, not to promise.